This is the job that the team here at AB electrical hold up as one of our biggest achievements. We delivered on a very demanding 6-week turnaround and the end result will always stand as testament to the degree of commitment, the level of technical and design excellence and the teamwork our company has become renowned for. The standout features of this job included:
Nestled on the main road of Orewa with a picturesque view of the beach is Coast Bar by Deep Creek. This was a job that called for fluidity, adaptability and the need to always be proactive in the way we ran circuits because this bar was designed as it was built. Our North Shore electricians had to constantly be thinking two or three stages ahead of themselves throughout the entire fit out.